Partial Street Closure - METRA Bridge @ Foster/Ravenswood

Work is planned in our neighborhood and some street closures will be necessary. The following closures are expected soon, including the partial closure of Foster at Ravenswood beginning on Monday.

FULL-STREET CLOSURE DATES –

  • W. Leland Ave and N Ravenswood (under Metra bridge) is anticipated to have a full closure from 10/19/2020 to 10/31/2020

  • W. Sunnyside Ave and N Ravenswood (under Metra bridge) is anticipated to have a full closure from 10/19/2020 to 10/24/2020

LANE CLOSURE DATES 

  • W. Foster Ave and N Ravenswood (under Metra bridge) is anticipated to have single lane closures from 9/28/2020 to 10/2/2020

  • W. Grace St and N Ravenswood (under Metra bridge) is anticipated to have single lane closures from 9/29/2020 to 9/30/2020

WANT BlockclubComment